You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Simultaneous transmission of High-order modulations and PN ranging for high-rate space-to-Earth
Approval
Draft
Document Number
to be assigned
Charter
5.01 RF and Modulation Working Group
Document Type
Orange
Description of Document
The objective of this experimental specification is to define a methodology for coupling the PN ranging with filtered high-order modulations, for allowing simultaneous demodulation of a high-rate telemetry stream while tracking the PN ranging sequence. The experimental specification will complement the followings CCSDS books:
401.0-B, that regulates the usage of GMSK with PN ranging
413.1-G, that, for the above, provides example of receivers and performance results
With the same analogy, the experimental standard will provide the followings:
Experimental normative specifications, for implementing a HoM with PN ranging system
An informative report, that provides examples of receivers, prototypes that were done, and performance results
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
The WG is not aware of any similar activity. Review of literature was done by ESA under two internal studies done from 2020 till 2024, and published on IEEE Journals, thus confirming the novelty of the technique.
Resources
Book Editor
ESA
Book Editor Resources
8 mm
Prototype 1
ESA
Prototype 1 Resources
0 mm, since already implemented by ESA (although not required)
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
Project Start Date
Internal WG Review
First Draft Circulated to WG
Fall 2025 meeting
First Draft Comments Due
Second draft circulated to WG
Second Draft Comments Due
Final WB Submitted to AD for Further Processing
External Milestones
Secretariat Document Processing
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
Total Time to Complete
(in months)
0
Attachments
Version: 23.0
Created at 12/2/2024 8:55 AM by Andrea Modenini