Overview

Project Title

Link Budget Digital Format (LBDF)

Approval

Draft

Document Number

to be assigned by Editor

Charter

5.02 Space Link Coding and Synchronization Working Group

Document Type

Orange

Description of Document

The scope of this document is to provide the definition of a Link Budget Digital Format (LBDF) that allows the sharing of TT&C (Tracking, Telemetry, and Command) and PDT (Payload Data Transmission) link budgets between CCSDS Agencies and potentially with and between external entities (e.g., aerospace industries) As the name suggests, LBDF will be a digital format, in XML language, the provides a snapshot of link budget results. In this way, CCSDS agencies can uses their own link budget calculation tools as usual and then, by means of a conversion tool, to capture their results in a single XML format, that can be shared with other parties. At this stage, the receiving party can import (still by means of a conversion tool) the results of the LBDF in its own link budget tool, for possibly reviewing and cross-checking calculations. Notice that, for keeping the indipendency and confidentiality of the link budget tools adopted by each entity, this standard will define just the XML format for capturing link budget results, not the calculation methodology. Thus, all entities interested in importing/exporting LBDF files, will need to develop their own conversion tool.

Applicable Patents

There are no patent issues for this technology that are known by the CCSDS community

Patent Comments

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

RFM and CS WGs are not aware of similar projects

Resources

Book Editor

ESA

Book Editor Resources

10 mm

Prototype 1

ESA

Prototype 1 Resources

8 mm

Prototype 2

Prototype 2 Resources

Prototype 3

Prototype 3 Resources

Contribute

Monitor Only

NASA

Resource Comments

ESA is suffering a shortage of manpower for supporting C&S and RFM WGs. In this respect, it would be good that CMC gets in touch with the ESA represantative to ensure that manpower will be allocated internally in ESA for supporing this project and in general C&S and RFM activities.

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet
First Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
Secretariat Document Processing 2Magenta BulletBlue Bullet
Final Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
First Prototype DevelopmentBlue Bullet
Second Prototype DevelopmentBlue Bullet
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet
Total Time to Complete
(in months)
0
Attachments
Version: 22.0
Created at 3/1/2024 7:56 AM by Andrea Modenini
Last modified at 3/11/2024 5:57 AM by Andrea Modenini