You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
VCM green book
Approval
Draft
Document Number
to be assigned
Charter
5.02 Space Link Coding and Synchronization Working Group
Document Type
Green
Description of Document
The objective of this activity is to issue a Green Book that will pair the Variable Coded Modulation Protocol Blue Book (431.1). The novel green book will provide first a general description about the benefits of using VCM at communication system level, especially for LEO missions with high data return. Then, it will include numerical results (obtained by means of software simulations or testing on a HW prototype) that can be adopted by CCSDS users as reference for trading-off the use of VCM in future missions. Results will be provided for all possible VCM formats (known as Type), as described by the 131.2-B (SCCC), 131.3-B (DVB-S2), and 431.1 (LDPC).
Applicable Patents
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
The WG identified the following books as related: -131.11-G, for SCCC, that focuses exclusively on the physical layer performance; -131.12-G, for DVB-S2, that focuses on physical layer performance, but also provides some insights about the use of VCM in satellite communication systems; The novel green book will instead focus exclusively at satellite communication system level, thus complementing the two green books. For sake of harmonization, at the end of this project, a comparison of the novel green book content will be done with the other two books. Possible changes will be carried out by means of dedicated projects or editorial updates.
Resources
Book Editor
TBD
Book Editor Resources
6 mm, Book editor TBD
Prototype 1
ESA
Prototype 1 Resources
8 mm. ESA will made available a prototype for HW testing, although not required by CCSDS. The rationale is to derive results that are more representative of actual satellite missions, rather than those derived by means of SW simulations.
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
ESA, NASA
Monitor Only
Resource Comments
Currently ESA/ESTEC people of the WG, contributing to this project, are having a shortage of manpower for CCSDS. Namely, ESTEC allocated just 0.3 mm for the full year for all CCSDS activities inside the WG. For this reason, project schedule has been put longer than usual.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
Project Start Date
Internal WG Review
First Draft Circulated to WG
for Spring 2025
First Draft Comments Due
Second draft circulated to WG
Second Draft Comments Due
Final WB Submitted to AD for Further Processing
External Milestones
Secretariat Document Processing
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
Total Time to Complete
(in months)
0
Attachments
Version: 123.0
Created at 10/4/2023 4:01 AM by Andrea Modenini
Last modified at 10/6/2023 8:30 AM by Andrea Modenini