Overview

Project Title

VCM green book

Approval

Draft

Document Number

to be assigned

Charter

5.02 Space Link Coding and Synchronization Working Group

Document Type

Green

Description of Document

The objective of this activity is to issue a Green Book that will pair the Variable Coded Modulation Protocol Blue Book (431.1). The novel green book will provide first a general description about the benefits of using VCM at communication system level, especially for LEO missions with high data return. Then, it will include numerical results (obtained by means of software simulations or testing on a HW prototype) that can be adopted by CCSDS users as reference for trading-off the use of VCM in future missions. Results will be provided for all possible VCM formats (known as Type), as described by the 131.2-B (SCCC), 131.3-B (DVB-S2), and 431.1 (LDPC).

Applicable Patents

Patent Comments

Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS

The WG identified the following books as related: -131.11-G, for SCCC, that focuses exclusively on the physical layer performance; -131.12-G, for DVB-S2, that focuses on physical layer performance, but also provides some insights about the use of VCM in satellite communication systems; The novel green book will instead focus exclusively at satellite communication system level, thus complementing the two green books. For sake of harmonization, at the end of this project, a comparison of the novel green book content will be done with the other two books. Possible changes will be carried out by means of dedicated projects or editorial updates.

Resources

Book Editor

TBD

Book Editor Resources

6 mm, Book editor TBD

Prototype 1

ESA

Prototype 1 Resources

8 mm. ESA will made available a prototype for HW testing, although not required by CCSDS. The rationale is to derive results that are more representative of actual satellite missions, rather than those derived by means of SW simulations.

Prototype 2

Prototype 2 Resources

Prototype 3

Prototype 3 Resources

Contribute

ESA, NASA

Monitor Only

Resource Comments

Currently ESA/ESTEC people of the WG, contributing to this project, are having a shortage of manpower for CCSDS. Namely, ESTEC allocated just 0.3 mm for the full year for all CCSDS activities inside the WG. For this reason, project schedule has been put longer than usual.

Schedule

Legend for Schedule Milestones
Orange Bullet = Required for Orange Books
Green Bullet = Required for Green Books
Magenta Bullet = Required for Magenta Books
Blue Bullet = Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books

Schedule Milestones
Orange BookGreen BookMagenta BookBlue Book
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project ApprovedOrange BulletGreen BulletMagenta BulletBlue Bullet
Project Start DateOrange BulletGreen BulletMagenta BulletBlue Bullet
Internal WG Review
First Draft Circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bulletfor Spring 2025
First Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet
Second draft circulated to WGOrange BulletGreen BulletMagenta BulletBlue Bullet
Second Draft Comments DueOrange BulletGreen BulletMagenta BulletBlue Bullet
Final WB Submitted to AD for Further ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet
External Milestones
Secretariat Document ProcessingOrange BulletGreen BulletMagenta BulletBlue Bullet
First Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
Secretariat Document Processing 2Magenta BulletBlue Bullet
Final Agency ReviewMagenta BulletBlue Bullet
RID ResolutionMagenta BulletBlue Bullet
First Prototype DevelopmentOrange BulletBlue Bullet
Second Prototype DevelopmentBlue Bullet
CMC ApprovalOrange BulletGreen BulletMagenta BulletBlue Bullet
Total Time to Complete
(in months)
0
Attachments
Version: 123.0
Created at 10/4/2023 4:01 AM by Andrea Modenini
Last modified at 10/6/2023 8:30 AM by Andrea Modenini