You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Launch Data Message
Approval
Approved
Document Number
507.1
Charter
2.02 Navigation Working Group
Document Type
Blue
Description of Document
This project, currently a "Draft Project" was originally proposed in 2016, but it was never submitted for CMC Approval given other higher priority work being conducted in the Navigation Working Group. See CCSDS-required Concept Paper at https://cwe.ccsds.org/moims/docs/MOIMS-NAV/Draft%20Documents/Concept%20Papers/LDM/Launch_Data_Message-20221216.pdf Extensive coordination activities and analyses are required to prepare for and conduct successful spacecraft launch and early orbit sequences. The owners, operators and analysts of the launchers, upper stages, and deployed satellites often span a diverse international and organizational space community. Space lift providers commonly launch and deploy many satellites in a single launch. This is especially driven by nanosatellite and CubeSat programs, with upcoming launches anticipated to deploy as many as 100 multi-national spacecraft. Each entity may have different methods for coordination, launch data content, spacecraft commissioning and operation. This can yield a lack of coordination between pertinent space organizations, extensive workload in converting non-standard launch data formats, and the potential for data misinterpretation and operational errors. The Launch Data Message serves to improve all data exchange, coordination and inter-organizational aspects of both domestic and international launches, thereby reducing operations costs, increasing overall efficiency and minimizing operational risk.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
A survey of available standards conducted by the US National Institute for Standards and Technology turned up nothing like the Concept for the Launch Data Message. The proposal is an aggregate of a number of currently available launch information sharing vehicles, but they are not in one centralized message. This message will aggregate and harmonize the various existing resources.
Resources
Book Editor
NASA
Book Editor Resources
The prospective Book Editor estimates 8 man months +/-1 man month.
Prototype 1
NASA
Prototype 1 Resources
8 man months +/- 1 man month. Note that the first prototype will be prepared by the document proposer, an employee of COMSPOC Corporation, an American company headquartered in Exton, PA.
Prototype 2
UKSA
Prototype 2 Resources
8 man months +/- 1 man month. Note that the second prototype will be prepared by U.K. Space Agency (Josh Brayford, Head of Space Standards at UKSA) has now committed to serving as the second prototyper for the LDM. Modified 06/01/2023 while review is in progress based on rejection by CNES.
Prototype 3
Prototype 3 Resources
Contribute
DLR, ESA, JAXA, NASA, UKSA
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/2/2018
CMC-P-2023-05-003
Project Start Date
1/2/2018
Internal WG Review
First Draft Circulated to WG
First Draft Comments Due
Second draft circulated to WG
Second Draft Comments Due
Final WB Submitted to AD for Further Processing
External Milestones
Secretariat Document Processing
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
4/30/2021
Total Time to Complete
(in months)
39
Attachments
Version: 382.0
Created at 2/15/2016 10:07 AM by Berry David
Last modified at 1/11/2024 3:42 PM by Tom Gannett