You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Navigation Events Message
Approval
Approved
Document Number
507.0
Charter
2.02 Navigation Working Group
Document Type
Blue
Description of Document
Orbital events describe when and possibly how some situations (generally related to a satellite) occur or have occurred. Orbital events constitute a major data type used in control centers for operations. However, no standard exists yet. The standard to be defined with this project is intended to simplify the exchange of events data between different entities and/or agencies.
Applicable Patents
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
CNES
Book Editor Resources
3 work months in 2018 and 2019
Prototype 1
CNES
Prototype 1 Resources
3 work months 2019
Prototype 2
ESA
Prototype 2 Resources
3 work months 2019
Prototype 3
Prototype 3 Resources
Contribute
DLR, ESA, NASA
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
9/30/2017
Initial estimate for project approval
Project Start Date
10/1/2017
Kicked off at 2017 Fall Meetings
Internal WG Review
First Draft Circulated to WG
10/1/2018
First Draft Comments Due
11/1/2018
Second draft circulated to WG
10/1/2019
Second Draft Comments Due
11/1/2019
Final WB Submitted to AD for Further Processing
12/1/2019
External Milestones
Secretariat Document Processing
2/15/2019
First Agency Review
4/15/2019
RID Resolution
5/31/2019
`
Secretariat Document Processing 2
6/30/2019
Final Agency Review
RID Resolution
First Prototype Development
9/30/2021
Second Prototype Development
9/30/2022
CMC Approval
11/30/2019
Total Time to Complete
(in months)
26
Attachments
Version: 574.0
Created at 7/1/2015 6:38 PM by Berry David
Last modified at 11/10/2023 4:23 AM by David Berry