You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Mission Operations - Message Abstraction Layer Binding to HTTP Transport and XML Encoding
Approval
Approved
Document Number
524.3
Charter
2.04 Spacecraft Monitoring and Control Working Group
Document Type
Blue
Description of Document
Specification for Mission Operation (MO) Services over HTTP communication and XML message encoding.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
None.
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
None.
Resources
Book Editor
ESA
Book Editor Resources
6mm. The specification of MO bindings to a transport and encoding is not a complext conceptual matter but more a question of a mapping. The existing SPP blue book provides a good template for producing other binding specifications. However a major part of the work is already done in the context of a parallel ESA activity (outside CCSDS), which has produced a draft specification in the expected Blue Book format. Hence it is expected that 1mm of effort shall be needed in the WG for the review and finalisation of the book.
Prototype 1
ESA
Prototype 1 Resources
3 mm. See the point above. A PoC will also be implemented as part of the above mentioned ESA parallel activity.
Prototype 2
NASA
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, NASA, UKSA
Monitor Only
JAXA
Resource Comments
see the comments above. In the context of an already approved and funded ESA/NASA-JPL MO prototype it is planned to use HTTP communication and XML encoding, based on the available white book. Hence this activity will contribute to the improvement of the book and to its prototyping, resulting in less required effort for the final review and prototyping activity in the CCSDS context.
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
3/30/2015
Project Start Date
Internal WG Review
First Draft Circulated to WG
4/30/2015
First Draft Comments Due
5/31/2015
Second draft circulated to WG
9/30/2015
Second Draft Comments Due
11/30/2015
Final WB Submitted to AD for Further Processing
3/31/2016
External Milestones
Secretariat Document Processing
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
4/30/2016
Total Time to Complete
(in months)
1,373
Attachments
Version: 210.0
Created at 3/25/2015 2:55 PM by Sarkarati Mehran
Last modified at 10/15/2018 5:52 PM by Brian Oliver