You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Delta-DOR technical Characteristics and performance - Issue 2
Approval
Approved
Document Number
500.1
Charter
1.06 Delta-DOR Working Group
Document Type
Green
Description of Document
Issue 2 of the Delta-DOR Green Book addresses the following points on top of the current material: - Different signal structures that can be used for Deep Space and/or Near Earth Astrometry mission applications. Such signal structures could be: a) the use of spread spetrum DOR signals, b) the use of high rate telemetry downlinks in place of DOR tones (for certain kind of missions) c) sweeping DOR tones - System level approach addressing onboard signal generation, ground station recording, and processing center correlation algorithms. The book provides material that could evolve into a new Magenta Book for the recommendations on architectures and into a new Blue Book for the specific signal structures to be employed (to be issued with the RF&Mod WG)
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
N/A
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
NASA
Book Editor Resources
NASA/JPL (Project allocation: 6MM)
Prototype 1
Not Required
Prototype 1 Resources
Prototype 2
Not Required
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
ESA, JAXA
Monitor Only
FSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
10/31/2013
10/31/2013
12/3/2013
CMC-P-2013-11-003 +DLR confirmation
Project Start Date
12/3/2013
12/3/2013
12/3/2013
Internal WG Review
First Draft Circulated to WG
2/28/2015
2/28/2016
2/28/2016
First Draft Comments Due
4/30/2015
4/30/2016
4/30/2016
Second draft circulated to WG
12/31/2015
12/31/2016
12/31/2016
Second Draft Comments Due
3/15/2016
3/15/2017
3/15/2017
Final WB Submitted to AD for Further Processing
6/30/2016
6/30/2017
6/30/2017
External Milestones
Secretariat Document Processing
8/31/2016
12/31/2019
11/30/2019
First Agency Review
11/30/2019
11/30/2019
RID Resolution
11/30/2019
11/30/2019
Secretariat Document Processing 2
11/30/2019
11/30/2019
Final Agency Review
11/30/2019
11/30/2019
RID Resolution
11/30/2019
11/30/2019
First Prototype Development
11/30/2019
11/30/2019
Second Prototype Development
11/30/2019
11/30/2019
CMC Approval
10/31/2016
12/31/2019
11/30/2019
Total Time to Complete
(in months)
34
72
Attachments
Version: 408.0
Created at 9/27/2013 2:26 AM by Madde Roberto
Last modified at 12/4/2019 8:40 AM by Brian Oliver