You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Mission Operations Time Services
Approval
Draft
Document Number
Charter
2.04 Spacecraft Monitoring and Control Working Group
Document Type
Blue
Description of Document
Time correlation between on-board clocks and the system reference time is required to support mission operations, for basic M&C purposes, on-board scheduling and flight dynamics. The time service includes the following operations:
- Report Time
- Correlate Time
- Set Time
- Configure rate of Time Report generation.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
Book Editor Resources
Prototype 1
Prototype 1 Resources
Prototype 2
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
Monitor Only
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/1/2018
1/1/2006
1/1/2006
Project Start Date
1/1/2018
1/1/2006
Internal WG Review
First Draft Circulated to WG
1/1/2014
First Draft Comments Due
10/22/2014
Second draft circulated to WG
11/5/2014
Second Draft Comments Due
11/26/2014
Final WB Submitted to AD for Further Processing
12/10/2014
External Milestones
Secretariat Document Processing
12/17/2015
First Agency Review
2/8/2016
RID Resolution
5/23/2016
Secretariat Document Processing 2
5/30/2016
Final Agency Review
6/29/2016
RID Resolution
10/11/2016
First Prototype Development
2/8/2017
Second Prototype Development
4/9/2017
CMC Approval
10/25/2021
1/1/2021
Total Time to Complete
(in months)
1,438
35
Attachments
Version: 122.0
Created at 11/23/2008 9:31 AM by Merri Mario
Last modified at 4/7/2016 10:29 PM by CCSDS Tech Support