You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Mission Operations - Monitor & Control Services
Approval
Approved
Document Number
522.1
Charter
2.04 Spacecraft Monitoring and Control Working Group
Document Type
Blue
Description of Document
It provides basic monitoring and control capability through three basic classes of information:
- Parameters provide status monitoring capability
- Actions allow control directives to be invoked and their evolving status monitored: spacecraft telecommands are an example of an action
- Alerts provide a mechanism for asynchronous notification of operationally significant events or anomalies by the service provider to the service consumer.
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
Prototype 1
ESA
Prototype 1 Resources
Prototype 2
DLR
Prototype 2 Resources
Prototype 3
Prototype 3 Resources
Contribute
CNES, NASA, UKSA
Monitor Only
ASI, CSA, FSA, INPE, JAXA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
1/1/2006
1/1/2006
1/1/2006
This is mainly a re-arrangement of existing material following the SM&C document reorganisation documented in the SM&C document Roadmap.
Project Start Date
1/1/2006
1/1/2006
1/1/2006
Internal WG Review
First Draft Circulated to WG
6/2/2009
5/1/2011
5/1/2011
About 1 month delay has been introduced to allow SciSys to work on the EUMETSAT MAL prototype.
First Draft Comments Due
6/30/2009
5/31/2011
5/31/2011
Second draft circulated to WG
6/30/2009
8/15/2011
8/15/2011
Second Draft Comments Due
6/30/2009
8/31/2011
8/31/2011
Final WB Submitted to AD for Further Processing
7/3/2009
10/30/2011
10/30/2011
External Milestones
Secretariat Document Processing
7/6/2009
12/29/2011
12/29/2011
First Agency Review
8/17/2009
2/27/2012
2/27/2012
RID Resolution
10/30/2009
12/15/2013
12/15/2013
Secretariat Document Processing 2
2/13/2014
2/13/2014
Final Agency Review
6/26/2017
6/26/2017
RID Resolution
8/1/2017
6/26/2017
First Prototype Development
5/30/2010
7/31/2016
9/5/2016
Second Prototype Development
7/31/2016
9/5/2016
CMC Approval
7/15/2010
10/1/2017
10/1/2017
Total Time to Complete
(in months)
54
139
Attachments
Version: 359.0
Created at 11/23/2008 8:52 AM by Merri Mario
Last modified at 4/3/2018 5:15 PM by Laura Stafford