You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Turn off Animations
Turn on Animations
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Browse
Tab 1 of 3.
View
Tab 2 of 3.
Page
Tab 3 of 3.
Edit
Item
Version History
Shared With
Delete Item
Manage
CCSDS.org
CWE
Areas
- SEA
- MOIMS
- CSS
- SOIS
- SLS
- SIS
Management
- CESG
- CMC
- Secretariat
- SANA
Framework
Currently selected
My Profile
Request Login
Password Management
- Change Password
- Forgot or Expired Password
Projects
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Polling
Recent
Meeting Registration Spring 2023
Meeting Registration Spring 2020
Recycle Bin
Site contents
Manage Permissions
|
Version History
Overview
Project Title
Space Data Link Security Concept of Operation, Issue 1
Approval
Approved
Document Number
350.5
Charter
5.09 Space Data Link Security WG
Document Type
Green
Description of Document
Space Data Link Security Protocol Green Book containing :
- rationale and justification of the design of the protocol
- user requirement document for the protocol
- user manual of the protocol
- mission profiles (if needed)
- discussion of performance and choice of cryptographic algorithm(s)
This green book issue 1 covers the core SDLS protocol (build-1). An issue 2 will be prepared in another project to cover in addition extended procedures of the SDLS protocol (key management, SA management, Monitoring & control) (build-2)
Applicable Patents
There are no patent issues for this technology that are known by the CCSDS community
Patent Comments
Survey of Similar Standards
Documents or Projects
Undertaken in Other Bodies
and elsewhere in CCSDS
Resources
Book Editor
ESA
Book Editor Resources
Prototype 1
Not Required
Prototype 1 Resources
Not required for Green Book.
Prototype 2
Not Required
Prototype 2 Resources
Not required for Green Book.
Prototype 3
Prototype 3 Resources
Contribute
CNES, DLR, ESA, NASA
Monitor Only
FSA, UKSA
Resource Comments
Schedule
Legend for Schedule Milestones
= Required for Orange Books
= Required for Green Books
= Required for Magenta Books
= Required for Blue Books
Note - Red Books are Draft Blue/Magenta Books
Schedule Milestones
Original Completion Date
(Date in M/D/YYYY format.)
Estimated Completion Date
(Date in M/D/YYYY format.)
Actual Completion Date
(Date in M/D/YYYY format.)
Comments
(Date in M/D/YYYY format.)
Project Approved
11/28/2008
11/28/2008
11/28/2008
Project Start Date
11/28/2008
11/28/2008
11/28/2008
Internal WG Review
First Draft Circulated to WG
12/15/2009
12/15/2009
3/5/2009
First Draft Comments Due
2/15/2010
2/15/2010
6/15/2009
Second draft circulated to WG
3/15/2010
4/17/2013
11/1/2013
Second Draft Comments Due
4/15/2010
4/15/2014
4/7/2014
Final WB Submitted to AD for Further Processing
6/15/2010
3/27/2017
4/11/2017
External Milestones
Secretariat Document Processing
9/15/2010
3/30/2018
4/30/2018
First Agency Review
RID Resolution
Secretariat Document Processing 2
Final Agency Review
RID Resolution
First Prototype Development
Second Prototype Development
CMC Approval
10/30/2010
6/21/2018
6/21/2018
Total Time to Complete
(in months)
23
113
Attachments
Version: 516.0
Created at 10/24/2008 12:21 PM by Moury Gilles
Last modified at 10/15/2018 11:25 AM by Gilles Moury